Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Employer and Design Consultant

Area schedule and parking calculation

AED 79
Launch offerAED 39.50 on your first order, until 31 December.
Design ConsultantEmployer
Clause
UAE practice
Time limit
Set by the agreement
Format
Excel, 6 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Concept design, 5. Schematic design, 6. Detailed design and approvalsRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • Gross floor, built-up and sellable or leasable areas by level and use, checked against the plot limits, with the parking requirement from the planning rules.
  • Sent by the Design Consultant to the Employer.
  • Written to UAE practice.

What you get

Save with a pack

Design Consultant to Employer: Concept design8 documents. Includes this document.
AED 763AED 499Save AED 264