Guides to the documents that matter
Each guide explains one process on a FIDIC-based project: the time limits, what each document must contain, sample wording and the templates for every step.
How to write a construction claim under FIDIC 20.1 on UAE and GCC projects: the 28-day notice, the 42-day detailed claim, sample wording and records.
6 min readRead the guide How to claim an extension of time (EOT) under FIDICA guide to extension of time claims on UAE and GCC projects: grounds under FIDIC 8.4, the 28 and 42-day limits, delay analysis, prolongation costs and a sample.
7 min readRead the guide How interim payment applications work under FIDICA guide to interim payment applications under FIDIC 14 on UAE and GCC projects: the payment cycle, Statement items, retention, materials on site and VAT.
6 min readRead the guide Variations in construction: request, proposal and variation orderVariation order and request format under FIDIC Clause 13 for UAE and GCC projects: who instructs, proposals, valuation, time effect and samples.
6 min readRead the guide How to give notice of a delayNotice of delay letter format for UAE and GCC projects: early warning (FIDIC 8.3), late drawings (1.9) and the 28-day notice of claim (20.1), with samples.
5 min readRead the guide Handover in construction: snag list, taking over and the defects periodA guide to handover on UAE and GCC projects under FIDIC Clause 10: the snag list, applying for taking over, deemed taking over and the defects period.