Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Employer and Design Consultant

Authority submissions and NOC tracker

AED 99
Launch offerAED 49.50 on your first order, until 31 December.
Design ConsultantEmployer
Clause
UAE practice
Time limit
Set by the agreement
Format
Excel, 5 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 5. Schematic design, 6. Detailed design and approvalsRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • Every municipality, civil defence and utility submission with dates, status and conditions.
  • Sent by the Design Consultant to the Employer.
  • Written to UAE practice.
  • Step 10 of 15 in the Design appointment and design development process.

What you get

Save with a pack

Design Consultant to Employer: Schematic design13 documents. Includes this document.
AED 1,288AED 839Save AED 449
Design appointment and design development process: Design Consultant steps8 documents. Includes this document.
AED 1,292AED 899Save AED 393

Where it sits in the processes

Design appointment and design development, step 10 of 15View all
BeforeDetailed design report
This documentAuthority submissions and NOC tracker
AfterClient approval control form

Also used between