Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Employer and Design Consultant

Building permit application tracker and checklist

AED 79
Launch offerAED 39.50 on your first order, until 31 December.
Design ConsultantEmployer
Clause
UAE practice
Time limit
Set by the agreement
Format
Excel, 5 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 6. Detailed design and approvalsRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • Permit stages, documents required, submission dates and approval conditions.
  • Sent by the Design Consultant to the Employer.
  • Written to UAE practice.

What you get

Save with a pack

Design Consultant to Employer: Detailed design and approvals15 documents. Includes this document.
AED 1,356AED 879Save AED 477
How to write it

How to track a building permit

A building permit passes through several stages and several authorities before work can start. The tracker lists each stage, the documents it needs and the dates planned and achieved, so you always know which stage you are in and what is still missing. The steps differ between the Emirates, so set the list to your authority’s current requirements.

What to include

  1. 1Each permit stage, from the plot information to the permit to start work
  2. 2The documents for each stage, marked ready, submitted and accepted
  3. 3Who prepares each document, and when it is due
  4. 4Planned and actual dates for each submission and approval
  5. 5Every approval condition, with an owner and a date to close it
  6. 6No objection certificates from other authorities, such as civil defence, power, water and roads
  7. 7A summary showing the current stage and anything late

When to use it

From the start of design, when the plot information is requested, until the permit to start construction. Update it every week, and every time a document is submitted or comments come back.

Read the full guideFire reports in construction: from the safety strategy to the civil defence certificate
Sample wording
Stage 4, detailed design submission: submitted on 12 May 2026, comments received on 26 May 2026. Two conditions are open: civil defence approval of the fire drawings, owner the MEP lead, due 9 June 2026; and the power authority NOC for the substation, owner the electrical engineer, due 16 June 2026.

Common mistakes

  • Using an old document list after the authority has changed its requirements
  • Recording the submission but not the conditions that come with the approval
  • Starting no objection requests late, when they take the longest

Questions people ask

Who applies for the building permit?

Usually the design consultant, on behalf of the owner, as the agreement requires, because in most Emirates the authority accepts submissions only from a licensed consultant. The owner provides the plot documents and pays the fees.

Are the stages the same in every Emirate?

No. Each Emirate has its own authority, online system and document list, and they change over time. Set the stages before you start, and check the current requirements with the authority.

Also used between