Building permit application tracker and checklist
What this document does
- Permit stages, documents required, submission dates and approval conditions.
- Sent by the Design Consultant to the Employer.
- Written to UAE practice.
What you get
- Excel register with automatic totals
- Checklist of attachments
- One-page guide on when and how to use it
- A full Arabic copy of every file, right to left
- File: Excel, 5 sheets
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
How to track a building permit
A building permit passes through several stages and several authorities before work can start. The tracker lists each stage, the documents it needs and the dates planned and achieved, so you always know which stage you are in and what is still missing. The steps differ between the Emirates, so set the list to your authority’s current requirements.
What to include
- 1Each permit stage, from the plot information to the permit to start work
- 2The documents for each stage, marked ready, submitted and accepted
- 3Who prepares each document, and when it is due
- 4Planned and actual dates for each submission and approval
- 5Every approval condition, with an owner and a date to close it
- 6No objection certificates from other authorities, such as civil defence, power, water and roads
- 7A summary showing the current stage and anything late
When to use it
From the start of design, when the plot information is requested, until the permit to start construction. Update it every week, and every time a document is submitted or comments come back.
Stage 4, detailed design submission: submitted on 12 May 2026, comments received on 26 May 2026. Two conditions are open: civil defence approval of the fire drawings, owner the MEP lead, due 9 June 2026; and the power authority NOC for the substation, owner the electrical engineer, due 16 June 2026.
Common mistakes
- Using an old document list after the authority has changed its requirements
- Recording the submission but not the conditions that come with the approval
- Starting no objection requests late, when they take the longest
Questions people ask
Who applies for the building permit?
Usually the design consultant, on behalf of the owner, as the agreement requires, because in most Emirates the authority accepts submissions only from a licensed consultant. The owner provides the plot documents and pays the fees.
Are the stages the same in every Emirate?
No. Each Emirate has its own authority, online system and document list, and they change over time. Set the stages before you start, and check the current requirements with the authority.