Main Contractor and Supplier
AED 295AED 189Save AED 106
Cable, switchgear and panel factory test certificates checklist
AED 39
Launch offerAED 19.50 on your first order, until 31 December.
SupplierMain Contractor
Clause
UAE practice
Time limit
Set by the agreement
Format
Excel, 4 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: Electrical, ELV and ICT, Street lighting
What this document does
- Type and routine test certificates each electrical delivery must carry, ticked on receipt.
- Sent by the Supplier to the Main Contractor.
- Written to UAE practice.
- Written for: Electrical, ELV and ICT, Street lighting.
What you get
- Checklist of attachments
- A full Arabic copy of every file, right to left
- File: Excel, 4 sheets
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Supplier to Main Contractor: Build and monitor, Electrical5 documents. Includes this document.