Employer and Main Contractor
AED 463AED 299Save AED 164
Contractor’s design professional indemnity confirmation
AED 49
Launch offerAED 24.50 on your first order, until 31 December.
Main ContractorEmployer
Clause
FIDIC 1999 Yellow BookSub-Clause 18.5
Time limit
Set by the agreement
Format
Word, 4 pagesLanguage: English, plus a full Arabic copy
Stage
Post-contract: 3. Sign and startRoute: Design and Build
What this document does
- Insurer confirmation of design liability cover, limit and period, for the contractor and its designer.
- Sent by the Main Contractor to the Employer.
- Written to FIDIC 1999 Yellow Book, Sub-Clause 18.5.
- For Design and Build projects only.
What you get
- Editable Word template
- Register sheet
- A full Arabic copy of every file, right to left
- File: Word, 4 pages
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Main Contractor to Employer: Sign and start7 documents. Includes this document.