Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Employer and Main Contractor

Contractor’s design professional indemnity confirmation

AED 49
Launch offerAED 24.50 on your first order, until 31 December.
Main ContractorEmployer
Clause
FIDIC 1999 Yellow BookSub-Clause 18.5
Time limit
Set by the agreement
Format
Word, 4 pagesLanguage: English, plus a full Arabic copy
Stage
Post-contract: 3. Sign and startRoute: Design and Build

What this document does

  • Insurer confirmation of design liability cover, limit and period, for the contractor and its designer.
  • Sent by the Main Contractor to the Employer.
  • Written to FIDIC 1999 Yellow Book, Sub-Clause 18.5.
  • For Design and Build projects only.

What you get

Save with a pack

Main Contractor to Employer: Sign and start7 documents. Includes this document.
AED 463AED 299Save AED 164