Cost plan to NRM 1: order of cost estimate and elemental cost plan

AED 149
Launch offerAED 74.50 on your first order, until 31 December.
Design ConsultantEmployer
Clause
RICS NRM 1
Time limit
Set by the agreement
Format
Excel, 6 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Concept design, 5. Schematic design, 6. Detailed design and approvalsRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • The order of cost estimate at concept, then the elemental cost plan updated at each design stage, with every movement explained and the contingency tracked.
  • Sent by the Design Consultant to the Employer.
  • Written to RICS NRM 1.

What you get

Save with a pack

Design Consultant to Employer: Concept design8 documents. Includes this document.
AED 763AED 499Save AED 264
How to write it

How to prepare a cost plan to NRM 1

NRM 1, published by RICS, sets a standard way to estimate and plan the cost of a building. At concept you prepare an order of cost estimate from floor areas and rates. As the design develops it becomes an elemental cost plan, updated at each stage and checked against the cost limit, with every movement explained.

What to include

  1. 1The gross floor area, the base date of the prices and what is excluded, such as VAT
  2. 2The building works by group element 0 to 8, with quantities and rates
  3. 3The main contractor’s preliminaries, and its overheads and profit
  4. 4Project and design team fees, and other development costs
  5. 5The four risk allowances: design development, construction, employer change and employer other risks
  6. 6Inflation to the tender date and through construction
  7. 7A log of every movement since the last stage, with its reason

When to use it

At concept design for the order of cost estimate, then at schematic and detailed design for the elemental cost plan, and before every approval the client gives. Keep the prices at the stated base date.

Sample wording
Cost plan 2, schematic design, at first quarter 2026 prices: works cost estimate AED 148.2 million; fees and other costs AED 16.3 million; risk allowances AED 9.9 million; cost limit AED 174.4 million, excluding inflation and VAT. Movement from cost plan 1: plus AED 3.1 million, for the larger basement approved on 12 May 2026.

Common mistakes

  • Using the risk allowances to absorb cost growth, instead of reducing them as risks are resolved
  • Movements between stages that are not explained
  • Mixing base dates, or leaving it unclear whether VAT is included

Questions people ask

What are the NRM 1 group elements?

0 facilitating works, 1 substructure, 2 superstructure, 3 internal finishes, 4 fittings, furnishings and equipment, 5 services, 6 prefabricated buildings and building units, 7 work to existing buildings and 8 external works.

What is the cost limit?

The base cost estimate plus the risk allowances: the most the client plans to spend, before inflation. Inflation is then added to reach the cost at the tender and construction dates.