Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Employer and Main Contractor

Delay damages notice and calculation

AED 79
Launch offerAED 39.50 on your first order, until 31 December.
EmployerMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 8.7
Time limit
Set by the agreement
Format
Word, 4 pagesExcel, 7 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 5. Changes and claimsRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • Applies the contract rate to the days of culpable delay up to the cap, for deduction in the next certificate.
  • Sent by the Employer to the Main Contractor.
  • Written to FIDIC 1999 Red Book, Sub-Clause 8.7.

What you get

  • Editable Word template
  • Excel schedules and summary sheet
  • One-page guide on when and how to use it
  • Worked example
  • A full Arabic copy of every file, right to left
  • File: Word, 4 pages
  • File: Excel, 7 sheets
  • Language: English, plus a full Arabic copy
  • Brand-ready: your logo and company details go in when you download
  • Pay once and use it on every project

Save with a pack

Employer to Main Contractor: Changes and claims7 documents. Includes this document.
AED 623AED 399Save AED 224