Employer and Design Consultant

Design basis report

Design ConsultantEmployer
Clause
UAE practice
Time limit
Set by the agreement
Format
WordLanguage: English
Stage
Post-contract: 4. Concept design, 5. Schematic designRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • Codes, authority regulations, design loads and criteria for every discipline, agreed before the design develops so every review checks against one baseline.
  • Sent by the Design Consultant to the Employer.
  • Written to UAE practice.