Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Employer and Design Consultant

Design change request

AED 49
Launch offerAED 24.50 on your first order, until 31 December.
EmployerDesign Consultant
Clause
FIDIC White Book 2017
Time limit
Set by the agreement
Format
Word, 4 pagesLanguage: English, plus a full Arabic copy
Stage
Post-contract: 8. Fees and changesRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • The Employer’s request to change the brief or design after a stage approval, with cost and time to be assessed.
  • Sent by the Employer to the Design Consultant.
  • Written to FIDIC White Book 2017.
  • Goes with: Additional services proposal (fee and time)

What you get

Save with a pack

Employer to Design Consultant: Fees and changes4 documents. Includes this document.
AED 286AED 189Save AED 97