Main Contractor and Design Consultant
Design consultancy appointment by the contractor
Main ContractorDesign Consultant
Clause
FIDIC White Book 2017
Time limit
Set by the agreement
Format
WordLanguage: English and Arabic
Stage
Post-contract: 3. Agreement and startRoute: Design and Build
What this document does
- Bilingual appointment with scope, deliverables, fee, programme, liability cap, PI and the duty to warrant the design to the Employer.
- Sent by the Main Contractor to the Design Consultant.
- Written to FIDIC White Book 2017.
- For Design and Build projects only.
What you get
- Editable Word template
- English and Arabic text side by side
- Schedules and appendices
- Clause-by-clause guide
- File: Word
- Language: English and Arabic
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project