Engineer and Main Contractor

Design coordination meeting minutes

EngineerMain Contractor
Clause
FIDIC 1999 Yellow BookSub-Clause 5.2
Time limit
Set by the agreement
Format
WordLanguage: English
Stage
Post-contract: 4. Build and monitorRoute: Design and Build

What this document does

  • Design issues, Employer comments and decisions, tracked to close-out between the designer, the contractor and the Engineer.
  • Sent by the Engineer to the Main Contractor.
  • Written to FIDIC 1999 Yellow Book, Sub-Clause 5.2.
  • For Design and Build projects only.

What you get