Design coordination meeting minutes
AED 39
Launch offerAED 19.50 on your first order, until 31 December.
EngineerMain Contractor
Clause
FIDIC 1999 Yellow BookSub-Clause 5.2
Time limit
Set by the agreement
Format
Word, 5 pagesLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Build and monitorRoute: Design and Build
What this document does
- Design issues, Employer comments and decisions, tracked to close-out between the designer, the contractor and the Engineer.
- Sent by the Engineer to the Main Contractor.
- Written to FIDIC 1999 Yellow Book, Sub-Clause 5.2.
- For Design and Build projects only.
What you get
- Editable Word template
- One-page guide on when and how to use it
- A full Arabic copy of every file, right to left
- File: Word, 5 pages
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Engineer to Main Contractor: Build and monitor9 documents. Includes this document.