Employer and Main Contractor
AED 1,311AED 849Save AED 462
Design responsibility matrix
AED 99
Launch offerAED 49.50 on your first order, until 31 December.
EmployerMain Contractor
Clause
FIDIC 1999 Yellow BookSub-Clause 5.1
Time limit
Set by the agreement
Format
Excel, 4 sheetsLanguage: English, plus a full Arabic copy
Stage
Pre-contract: 1. TenderRoute: Design and Build
What this document does
- Element by element, who designs, who checks, who approves and to what level, between the Employer, the contractor and specialists.
- Sent by the Employer to the Main Contractor.
- Written to FIDIC 1999 Yellow Book, Sub-Clause 5.1.
- For Design and Build projects only.
What you get
- Excel schedules and summary sheet
- One-page guide on when and how to use it
- Worked example
- A full Arabic copy of every file, right to left
- File: Excel, 4 sheets
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Employer to Main Contractor: Tender9 documents. Includes this document.