Employer and Design Consultant
AED 1,288AED 839Save AED 449
Design risk register
AED 79
Launch offerAED 39.50 on your first order, until 31 December.
Design ConsultantEmployer
Clause
UAE practice
Time limit
Set by the agreement
Format
Excel, 3 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 5. Schematic design, 6. Detailed design and approvalsRoute: Both routes
What this document does
- Design, authority, cost and buildability risks with owners, scores and mitigations.
- Sent by the Design Consultant to the Employer.
- Written to UAE practice.
What you get
- Excel register with automatic totals
- One-page guide on when and how to use it
- A full Arabic copy of every file, right to left
- File: Excel, 3 sheets
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Design Consultant to Employer: Schematic design13 documents. Includes this document.