Engineer and Main Contractor
Claim deadline calculatorEnter the date you became aware of the event and we email you 7 days before the notice and the fully detailed claim are due.
AED 454AED 299Save AED 155
Employer’s claim notice
AED 59
Launch offerAED 29.50 on your first order, until 31 December.
EngineerMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 2.5
Time limit
As soon as practicable after awareness
Format
Word, 2 pagesEnglish and Arabic copy, 2 pages
Stage
Post-contract: 5. Changes and claimsRoute: Both routes
What this document does
- Notifies a claim for payment or an extension of the defects period, with particulars.
- Sent by the Engineer to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 2.5.
- Time limit: As soon as practicable after awareness.
What you get
- Editable Word template
- An English copy, and a copy with English and Arabic side by side
- One-page guide on when and how to use it
- File: Word, 2 pages
- File: English and Arabic copy, 2 pages
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Engineer to Main Contractor: Changes and claims6 documents. Includes this document.