Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Engineer and Main Contractor

Employer’s claim notice

AED 59
Launch offerAED 29.50 on your first order, until 31 December.
EngineerMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 2.5
Time limit
As soon as practicable after awareness
Format
Word, 2 pagesEnglish and Arabic copy, 2 pages
Stage
Post-contract: 5. Changes and claimsRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

Claim deadline calculatorEnter the date you became aware of the event and we email you 7 days before the notice and the fully detailed claim are due.

What this document does

  • Notifies a claim for payment or an extension of the defects period, with particulars.
  • Sent by the Engineer to the Main Contractor.
  • Written to FIDIC 1999 Red Book, Sub-Clause 2.5.
  • Time limit: As soon as practicable after awareness.

What you get

Save with a pack

Engineer to Main Contractor: Changes and claims6 documents. Includes this document.
AED 454AED 299Save AED 155

Also used between