Engineer and Main Contractor

Employer’s claim notice

EngineerMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 2.5
Time limit
As soon as practicable after awareness
Format
WordLanguage: English and Arabic
Stage
Post-contract: 5. Changes and claimsRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • Notifies a claim for payment or an extension of the defects period, with particulars.
  • Sent by the Engineer to the Main Contractor.
  • Written to FIDIC 1999 Red Book, Sub-Clause 2.5.
  • Time limit: As soon as practicable after awareness.

What you get

Also used between