Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Employer and Main Contractor

Employer’s Requirements: structure and content checklist

AED 299
Launch offerAED 149.50 on your first order, until 31 December.
EmployerMain Contractor
Clause
FIDIC 1999 Yellow BookSub-Clause 1.1.1.5
Time limit
Set by the agreement
Format
Word, 9 pagesLanguage: English, plus a full Arabic copy
Stage
Pre-contract: 1. TenderRoute: Design and Build

What this document does

  • Purpose, scope, performance criteria, standards, design submission procedure, authority approvals and the schedule of Employer’s Requirements, section by section.
  • Sent by the Employer to the Main Contractor.
  • Written to FIDIC 1999 Yellow Book, Sub-Clause 1.1.1.5.
  • For Design and Build projects only.

What you get

Save with a pack

Employer to Main Contractor: Tender9 documents. Includes this document.
AED 1,311AED 849Save AED 462