Employer and Main Contractor
AED 1,311AED 849Save AED 462
Employer’s Requirements: structure and content checklist
AED 299
Launch offerAED 149.50 on your first order, until 31 December.
EmployerMain Contractor
Clause
FIDIC 1999 Yellow BookSub-Clause 1.1.1.5
Time limit
Set by the agreement
Format
Word, 9 pagesLanguage: English, plus a full Arabic copy
Stage
Pre-contract: 1. TenderRoute: Design and Build
What this document does
- Purpose, scope, performance criteria, standards, design submission procedure, authority approvals and the schedule of Employer’s Requirements, section by section.
- Sent by the Employer to the Main Contractor.
- Written to FIDIC 1999 Yellow Book, Sub-Clause 1.1.1.5.
- For Design and Build projects only.
What you get
- Editable Word template
- Checklist of attachments
- Clause-by-clause guide
- One-page guide on when and how to use it
- A full Arabic copy of every file, right to left
- File: Word, 9 pages
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Employer to Main Contractor: Tender9 documents. Includes this document.