Engineer and Main Contractor
AED 176AED 109Save AED 67
AED 654AED 459Save AED 195
Engineer’s delegation of authority to assistants
AED 49
Launch offerAED 24.50 on your first order, until 31 December.
EngineerMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 3.2
Time limit
Set by the agreement
Format
Word, 4 pagesLanguage: English, plus a full Arabic copy
Stage
Post-contract: 3. Sign and startRoute: Both routes
What this document does
- Names each assistant with the duties and authority delegated and their limits; determinations under Sub-Clause 3.5 stay with the Engineer. It takes effect once both parties receive it.
- Sent by the Engineer to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 3.2.
- Step 12 of 12 in the Supervision appointment and mobilisation process.
What you get
- Editable Word template
- Time-limit reminder table
- One-page guide on when and how to use it
- A full Arabic copy of every file, right to left
- File: Word, 4 pages
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Engineer to Main Contractor: Sign and start4 documents. Includes this document.
Supervision appointment and mobilisation process: Supervision Consultant steps6 documents. Includes this document.
Where it sits in the processes
Supervision appointment and mobilisation, step 12 of 12View all
BeforeSupervision plan and procedures manual
This documentEngineer’s delegation of authority to assistants
End of the process