Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Engineer and Main Contractor

Engineer’s delegation of authority to assistants

AED 49
Launch offerAED 24.50 on your first order, until 31 December.
EngineerMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 3.2
Time limit
Set by the agreement
Format
Word, 4 pagesLanguage: English, plus a full Arabic copy
Stage
Post-contract: 3. Sign and startRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • Names each assistant with the duties and authority delegated and their limits; determinations under Sub-Clause 3.5 stay with the Engineer. It takes effect once both parties receive it.
  • Sent by the Engineer to the Main Contractor.
  • Written to FIDIC 1999 Red Book, Sub-Clause 3.2.
  • Step 12 of 12 in the Supervision appointment and mobilisation process.

What you get

Save with a pack

Engineer to Main Contractor: Sign and start4 documents. Includes this document.
AED 176AED 109Save AED 67
Supervision appointment and mobilisation process: Supervision Consultant steps6 documents. Includes this document.
AED 654AED 459Save AED 195

Where it sits in the processes

Supervision appointment and mobilisation, step 12 of 12View all
BeforeSupervision plan and procedures manual
This documentEngineer’s delegation of authority to assistants
End of the process