Engineer and Main Contractor
Engineer’s instruction and register
EngineerMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 3.3
Time limit
Set by the agreement
Format
Word and ExcelLanguage: English
Stage
Post-contract: 4. Build and monitorRoute: Both routes
What this document does
- Numbered instruction stating whether it is a variation, with a register that tracks compliance and cost effect.
- Sent by the Engineer to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 3.3.
What you get
- Fillable form
- Register sheet
- One-page guide on when and how to use it
- File: Word and Excel
- Language: English
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project