Employer and Main Contractor

Estimate build-up and rate analysis

Main ContractorMain Contractorinternal
Clause
UAE practice
Time limit
Set by the agreement
Format
ExcelLanguage: English
Stage
Pre-contract: 1. TenderRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • Labour, plant, material and subcontract costs built up for each rate, with preliminaries, overheads, risk and margin carried to the tender summary.
  • Kept by the Main Contractor as its own record.
  • Written to UAE practice.