Employer and Main Contractor
AED 623AED 399Save AED 224
Extension of time approval and award letter
AED 59
Launch offerAED 29.50 on your first order, until 31 December.
EmployerMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 8.4
Time limit
Set by the agreement
Format
Word, 4 pagesEnglish and Arabic copy, 4 pages
Stage
Post-contract: 5. Changes and claimsRoute: Both routes
What this document does
- Internal approval under the delegation of authority and the letter issued through the Engineer.
- Sent by the Employer to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 8.4.
- Step 9 of 10 in the Delay and extension of time process.
What you get
- Fillable form
- Editable Word template
- An English copy, and a copy with English and Arabic side by side
- File: Word, 4 pages
- File: English and Arabic copy, 4 pages
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Employer to Main Contractor: Changes and claims7 documents. Includes this document.
Free basic version or the full version
Free
Basic version
- The English Word form, 4 pages
- No payment and no sign-up
- A line in the footer: Free basic version from builderdraft.com
Full version
AED 59
- The same Word form, with no line in the footer
- English and Arabic copy, 4 pages
- Your logo and company details on every file
Where it sits in the processes
Delay and extension of time, step 9 of 10View all
BeforeEngineer’s recommendation to the Employer (time and cost)
This documentExtension of time approval and award letter
AfterSubcontract extension of time grant or rejection