Finishes sample and batch approval record

SupplierMain Contractor
Clause
UAE practice
Time limit
Set by the agreement
Format
WordLanguage: English
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: Flooring and tiling, Painting and coatings, Joinery and doors, Blockwork and plaster

What this document does

  • Tile, stone, paint and laminate sample approvals with batch and shade control on delivery.
  • Sent by the Supplier to the Main Contractor.
  • Written to UAE practice.
  • Written for: Flooring and tiling, Painting and coatings, Joinery and doors, Blockwork and plaster.