Main Contractor and Supplier
Finishes sample and batch approval record
Free
Download freeSupplierMain Contractor
Clause
UAE practice
Time limit
Set by the agreement
Format
Word, 4 pagesLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: Flooring and tiling, Painting and coatings, Joinery and doors, Blockwork and plaster
What this document does
- Tile, stone, paint and laminate sample approvals with batch and shade control on delivery.
- Sent by the Supplier to the Main Contractor.
- Written to UAE practice.
- Written for: Flooring and tiling, Painting and coatings, Joinery and doors, Blockwork and plaster.
What you get
- Fillable form
- One-page guide on when and how to use it
- A full Arabic copy of every file, right to left
- File: Word, 4 pages
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project