Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Employer and Main Contractor

Fitness for purpose and design liability schedule

AED 149
Launch offerAED 74.50 on your first order, until 31 December.
EmployerMain Contractor
Clause
FIDIC 1999 Yellow BookSub-Clause 4.1
Time limit
Set by the agreement
Format
Word, 11 pagesLanguage: English, plus a full Arabic copy
Stage
Post-contract: 3. Sign and startRoute: Design and Build

What this document does

  • Records the purposes the works must be fit for, the design standard of care, limits and the insurance that backs it.
  • Sent by the Employer to the Main Contractor.
  • Written to FIDIC 1999 Yellow Book, Sub-Clause 4.1.
  • For Design and Build projects only.

What you get

Save with a pack

Employer to Main Contractor: Sign and start9 documents. Includes this document.
AED 972AED 629Save AED 343