Main Contractor and Supplier
AED 137AED 89Save AED 48
Goods received note and discrepancy log
AED 39
Launch offerAED 19.50 on your first order, until 31 December.
Main ContractorSupplier
Clause
UAE practice
Time limit
Set by the agreement
Format
Excel, 4 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Scope: Supply only, Supply and install, Design, supply and install
What this document does
- Confirms what arrived, in what condition, matched to the order, with shortages and damage logged.
- Sent by the Main Contractor to the Supplier.
- Written to UAE practice.
- Goes with: Delivery note and packing list
What you get
- Fillable form
- Log with status and ageing
- A full Arabic copy of every file, right to left
- File: Excel, 4 sheets
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Main Contractor to Supplier: Build and monitor3 documents. Includes this document.