Employer and Design Consultant
AED 395AED 259Save AED 136
AED 1,292AED 899Save AED 393
IFC package compliance certificate and transmittal
AED 49
Launch offerAED 24.50 on your first order, until 31 December.
Design ConsultantEmployer
Clause
UAE practice
Time limit
Set by the agreement
Format
Word, 3 pagesLanguage: English, plus a full Arabic copy
Stage
Post-contract: 9. Tender support and close-outRoute: Both routes
What this document does
- The designer certifies that the issued-for-construction package complies with the brief, codes and authority approvals.
- Sent by the Design Consultant to the Employer.
- Written to UAE practice.
- Step 14 of 15 in the Design appointment and design development process.
What you get
- Editable Word template
- Checklist of attachments
- A full Arabic copy of every file, right to left
- File: Word, 3 pages
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Design Consultant to Employer: Tender support and close-out5 documents. Includes this document.
Design appointment and design development process: Design Consultant steps8 documents. Includes this document.
Where it sits in the processes
Design appointment and design development, step 14 of 15View all
BeforeTender documents template set and package transmittal
This documentIFC package compliance certificate and transmittal
AfterInvitation to tender and instructions to tenderers