Employer and Specialist Vendor
AED 675AED 439Save AED 236
AED 484AED 339Save AED 145
Interface matrix: vendor supply against contractor installation
AED 99
Launch offerAED 49.50 on your first order, until 31 December.
EmployerSupplier
Clause
UAE practice
Time limit
Set by the agreement
Format
Excel, 3 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 3. Sign and startRoute: Both routes. Scope: Supply only, Supply and install, Design, supply and install, Services and supervision
What this document does
- Line by line, who supplies, who installs, who cables, who tests and who warrants each element.
- Sent by the Employer to the Supplier.
- Written to UAE practice.
- Step 12 of 14 in the Specialist equipment procurement process.
What you get
- Excel schedules and summary sheet
- One-page guide on when and how to use it
- Worked example
- A full Arabic copy of every file, right to left
- File: Excel, 3 sheets
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Employer to Supplier: Sign and start5 documents. Includes this document.
Specialist equipment procurement process: Employer steps6 documents. Includes this document.
Where it sits in the processes
Specialist equipment procurement, step 12 of 14View all
BeforeCustoms clearance and delivery acceptance record
This documentInterface matrix: vendor supply against contractor installation
AfterInstallation supervision and commissioning report (vendor)