Employer and Main Contractor

Mobilisation plan and checklist

AED 59
Launch offerAED 29.50 on your first order, until 31 December.
Main ContractorEmployer
Clause
UAE practice
Time limit
Set by the agreement
Format
Excel, 6 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 3. Sign and startRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • Site establishment, staff, plant, permits, insurances and the first submittals, with dates.
  • Sent by the Main Contractor to the Employer.
  • Written to UAE practice.

What you get

Save with a pack

Main Contractor to Employer: Sign and start6 documents. Includes this document.
AED 414AED 269Save AED 145
How to write it

How to plan mobilisation

The mobilisation plan covers the first weeks of a contract, from the Letter of Acceptance until the site is running. It lists every task needed to start work, gives each an owner and a date, and shows at a glance what is ready and what is late. Permits and utility connections take longest, so they start at award.

What to include

  1. 1The key dates: Letter of Acceptance, notice of the Commencement Date and the Commencement Date
  2. 2Contract documents and securities: Contract Agreement, Performance Security and insurances
  3. 3Site set-up: hoarding, offices, welfare, power, water and access
  4. 4Staff and labour, with approval of the key staff
  5. 5Plant and equipment, with inspection certificates
  6. 6Permits and authority approvals
  7. 7The first submittals: programme, method statements and the health and safety plan

When to use it

Start it at the Letter of Acceptance, before commencement. The contract sets several of the dates: the Contract Agreement and the Performance Security within 28 days of the Letter of Acceptance, the programme within 28 days of the notice, and the cash flow estimate within 42 days of the Commencement Date.

Read the full guideClear to pay: the checklist before the first payment
Sample wording
Item 14, temporary power: apply to the electricity authority for the site connection. Owner: the MEP manager. Planned 20 March 2026, before the Commencement Date of 1 April 2026. Status: application submitted, inspection booked for 26 March 2026.

Common mistakes

  • Starting permits and utility connections at commencement instead of at award
  • Items with no owner
  • Forgetting the contract time limits for the securities and the programme

Questions people ask

Which mobilisation dates come from the contract?

Under the FIDIC 1999 Red Book: the Contract Agreement and the Performance Security within 28 days after the Letter of Acceptance (1.6 and 4.2), the programme within 28 days after the notice of commencement (8.3), the cash flow estimate within 42 days after the Commencement Date (14.4) and monthly reports within 7 days after each month (4.21).

When is mobilisation complete?

When every item is confirmed or marked not applicable, and the site can work to the programme. Track it to that point, then move to the monthly report.