Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Employer and Design Consultant

NOC request letter set

AED 79
Launch offerAED 39.50 on your first order, until 31 December.
Design ConsultantEmployer
Clause
UAE practice
Time limit
Set by the agreement
Format
Word, 8 pagesEnglish and Arabic copy, 8 pages
Stage
Post-contract: 6. Detailed design and approvalsRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • Request letters for utility, road and telecom NOCs with the attachments each authority expects.
  • Sent by the Design Consultant to the Employer.
  • Written to UAE practice.

What you get

Save with a pack

Design Consultant to Employer: Detailed design and approvals15 documents. Includes this document.
AED 1,356AED 879Save AED 477

Also used between