Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Engineer and Main Contractor

Notice extending the defects notification period

AED 39
Launch offerAED 19.50 on your first order, until 31 December.
EngineerMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 11.3
Time limit
Extension limited to two years in total
Format
Word, 3 pagesEnglish and Arabic copy, 3 pages
Stage
Post-contract: 7. Handover and closeRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • Extends the period for works or sections that could not be used because of a defect.
  • Sent by the Engineer to the Main Contractor.
  • Written to FIDIC 1999 Red Book, Sub-Clause 11.3.
  • Time limit: Extension limited to two years in total.

What you get

Save with a pack

Engineer to Main Contractor: Handover and close6 documents. Includes this document.
AED 334AED 219Save AED 115