Notice extending the defects notification period
AED 39
Launch offerAED 19.50 on your first order, until 31 December.
EngineerMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 11.3
Time limit
Extension limited to two years in total
Format
Word, 3 pagesEnglish and Arabic copy, 3 pages
Stage
Post-contract: 7. Handover and closeRoute: Both routes
What this document does
- Extends the period for works or sections that could not be used because of a defect.
- Sent by the Engineer to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 11.3.
- Time limit: Extension limited to two years in total.
What you get
- Editable Word template
- An English copy, and a copy with English and Arabic side by side
- File: Word, 3 pages
- File: English and Arabic copy, 3 pages
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Engineer to Main Contractor: Handover and close6 documents. Includes this document.