Notice to correct
EngineerMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 15.1
Time limit
Set by the agreement
Format
WordLanguage: English and Arabic
Stage
Post-contract: 4. Build and monitorRoute: Both routes
What this document does
- Requires the contractor to make good a failure within a specified reasonable time.
- Sent by the Engineer to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 15.1.
What you get
- Editable Word template
- English and Arabic text side by side
- One-page guide on when and how to use it
- File: Word
- Language: English and Arabic
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project