Employer and Main Contractor
AED 1,311AED 849Save AED 462
Performance guarantees schedule and damages
AED 99
Launch offerAED 49.50 on your first order, until 31 December.
EmployerMain Contractor
Clause
FIDIC 1999 Yellow BookSub-Clause 12.4
Time limit
Set by the agreement
Format
Excel, 6 sheetsLanguage: English, plus a full Arabic copy
Stage
Pre-contract: 1. TenderRoute: Design and Build
What this document does
- Guaranteed performance values, test method, tolerance and the damages payable if the tests after completion fall short.
- Sent by the Employer to the Main Contractor.
- Written to FIDIC 1999 Yellow Book, Sub-Clause 12.4.
- For Design and Build projects only.
What you get
- Excel schedules and summary sheet
- One-page guide on when and how to use it
- A full Arabic copy of every file, right to left
- File: Excel, 6 sheets
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Employer to Main Contractor: Tender9 documents. Includes this document.