Main Contractor and Subcontractor
AED 236AED 149Save AED 87
Permit to work set
AED 79
Launch offerAED 39.50 on your first order, until 31 December.
Main ContractorSubcontractor
Clause
UAE practice
Time limit
Set by the agreement
Format
Word, 17 pagesLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Scope: Supply and install, Install only, Design, supply and install, Labour only
What this document does
- Hot work, confined space, lifting, excavation and working at height permits with a daily register.
- Sent by the Main Contractor to the Subcontractor.
- Written to UAE practice.
What you get
- Fillable form
- Register sheet
- One-page guide on when and how to use it
- A full Arabic copy of every file, right to left
- File: Word, 17 pages
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Main Contractor to Subcontractor: Build and monitor5 documents. Includes this document.