Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Main Contractor and Supplier

Pipe, valve and fitting certificates checklist

AED 39
Launch offerAED 19.50 on your first order, until 31 December.
SupplierMain Contractor
Clause
UAE practice
Time limit
Set by the agreement
Format
Excel, 4 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: Plumbing and drainage, Fire fighting and alarm, Utility networks, HVAC

What this document does

  • Material certificates, pressure ratings and approvals for water, drainage and fire systems.
  • Sent by the Supplier to the Main Contractor.
  • Written to UAE practice.
  • Written for: Plumbing and drainage, Fire fighting and alarm, Utility networks, HVAC.

What you get

Save with a pack

Supplier to Main Contractor: Build and monitor, Plumbing and drainage5 documents. Includes this document.
AED 295AED 189Save AED 106

Also used between