Main Contractor and Supplier
Pipe, valve and fitting certificates checklist
SupplierMain Contractor
Clause
UAE practice
Time limit
Set by the agreement
Format
ExcelLanguage: English
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: Plumbing and drainage, Fire fighting and alarm, Utility networks, HVAC
What this document does
- Material certificates, pressure ratings and approvals for water, drainage and fire systems.
- Sent by the Supplier to the Main Contractor.
- Written to UAE practice.
- Written for: Plumbing and drainage, Fire fighting and alarm, Utility networks, HVAC.
What you get
- Checklist of attachments
- File: Excel
- Language: English
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project