Employer and Main Contractor
AED 334AED 219Save AED 115
Post-taking-over site rules and access protocol
AED 49
Launch offerAED 24.50 on your first order, until 31 December.
EmployerMain Contractor
Clause
UAE practice
Time limit
Set by the agreement
Format
Word, 12 pagesLanguage: English, plus a full Arabic copy
Stage
Post-contract: 7. Handover and closeRoute: Both routes
What this document does
- Access, permits and coordination for defects work once the Employer occupies the building.
- Sent by the Employer to the Main Contractor.
- Written to UAE practice.
What you get
- Editable Word template
- One-page guide on when and how to use it
- A full Arabic copy of every file, right to left
- File: Word, 12 pages
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Employer to Main Contractor: Handover and close6 documents. Includes this document.