Main Contractor and Supplier
AED 334AED 219Save AED 115
Ready-mix delivery docket and plant certificate set
AED 39
Launch offerAED 19.50 on your first order, until 31 December.
SupplierMain Contractor
Clause
UAE practice
Time limit
Set by the agreement
Format
Excel, 5 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: Concrete structure
What this document does
- Docket format with mix reference, batching time and temperature, plus the plant approvals to keep on file.
- Sent by the Supplier to the Main Contractor.
- Written to UAE practice.
- Written for: Concrete structure.
What you get
- Fillable form
- Checklist of attachments
- A full Arabic copy of every file, right to left
- File: Excel, 5 sheets
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Supplier to Main Contractor: Build and monitor, Concrete structure6 documents. Includes this document.