Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Main Contractor and Supplier

Ready-mix delivery docket and plant certificate set

AED 39
Launch offerAED 19.50 on your first order, until 31 December.
SupplierMain Contractor
Clause
UAE practice
Time limit
Set by the agreement
Format
Excel, 5 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: Concrete structure

What this document does

  • Docket format with mix reference, batching time and temperature, plus the plant approvals to keep on file.
  • Sent by the Supplier to the Main Contractor.
  • Written to UAE practice.
  • Written for: Concrete structure.

What you get

Save with a pack

Supplier to Main Contractor: Build and monitor, Concrete structure6 documents. Includes this document.
AED 334AED 219Save AED 115

Also used between