Engineer and Main Contractor
Recommendation to remedy by others and cost recovery notice
EngineerMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 11.4
Time limit
Set by the agreement
Format
WordLanguage: English
Stage
Post-contract: 7. Handover and closeRoute: Both routes
What this document does
- Records the contractor’s failure to remedy within a reasonable time and the cost to be recovered.
- Sent by the Engineer to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 11.4.
What you get
- Editable Word template
- One-page guide on when and how to use it
- File: Word
- Language: English
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project