Engineer and Main Contractor

Recommendation to remedy by others and cost recovery notice

EngineerMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 11.4
Time limit
Set by the agreement
Format
WordLanguage: English
Stage
Post-contract: 7. Handover and closeRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • Records the contractor’s failure to remedy within a reasonable time and the cost to be recovered.
  • Sent by the Engineer to the Main Contractor.
  • Written to FIDIC 1999 Red Book, Sub-Clause 11.4.