Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Employer and Design Consultant

Regret letter to unsuccessful bidders

AED 39
Launch offerAED 19.50 on your first order, until 31 December.
EmployerDesign Consultant
Clause
UAE practice
Time limit
Issued once the successful bidder has accepted the award and provided any security required
Format
Word, 2 pagesEnglish and Arabic copy, 2 pages
Stage
Pre-contract: 2. Proposal and awardRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • Closes the tender professionally and releases tender bonds.
  • Sent by the Employer to the Design Consultant.
  • Written to UAE practice.
  • Time limit: Issued once the successful bidder has accepted the award and provided any security required.

What you get

Save with a pack

Employer to Design Consultant: Proposal and award6 documents. Includes this document.
AED 544AED 349Save AED 195

Free basic version or the full version

Free

Basic version

  • The English Word form, 2 pages
  • No payment and no sign-up
  • A line in the footer: Free basic version from builderdraft.com
Download free
Full version

AED 39

  • The same Word form, with no line in the footer
  • English and Arabic copy, 2 pages
  • Your logo and company details on every file

Also used between