Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Employer and Design Consultant

Site data and survey requirements schedule

AED 79
Launch offerAED 39.50 on your first order, until 31 December.
Design ConsultantEmployer
Clause
UAE practice
Time limit
Set by the agreement
Format
Excel, 3 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 3. Agreement and startRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • What the designer needs from the Employer before concept: topographic and utility surveys, geotechnical investigation, plot affection plan and planning data, with the scope and date for each.
  • Sent by the Design Consultant to the Employer.
  • Written to UAE practice.

What you get

Save with a pack

Design Consultant to Employer: Agreement and start5 documents. Includes this document.
AED 485AED 319Save AED 166