Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Employer and Main Contractor

Site handover and possession record

AED 49
Launch offerAED 24.50 on your first order, until 31 December.
EmployerMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 2.1
Time limit
Set by the agreement
Format
Word, 5 pagesLanguage: English, plus a full Arabic copy
Stage
Post-contract: 3. Sign and startRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • Records the date, extent and condition of the site given to the contractor.
  • Sent by the Employer to the Main Contractor.
  • Written to FIDIC 1999 Red Book, Sub-Clause 2.1.

What you get

Save with a pack

Employer to Main Contractor: Sign and start7 documents. Includes this document.
AED 524AED 339Save AED 185