Main Contractor and Subcontractor
AED 1,633AED 1,059Save AED 574
Site rules, attendances and contra-charge schedule
AED 59
Launch offerAED 29.50 on your first order, until 31 December.
Main ContractorSubcontractor
Clause
FIDIC Conditions of Subcontract 2011
Time limit
Set by the agreement
Format
Word, 6 pagesExcel, 7 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 3. Sign and startRoute: Both routes. Scope: Supply and install, Install only, Design, supply and install, Labour only
What this document does
- What the main contractor provides free, what is charged and at what rate: power, water, cranage, scaffolding, waste removal.
- Sent by the Main Contractor to the Subcontractor.
- Written to FIDIC Conditions of Subcontract 2011.
What you get
- Editable Word template
- Excel schedules and summary sheet
- One-page guide on when and how to use it
- A full Arabic copy of every file, right to left
- File: Word, 6 pages
- File: Excel, 7 sheets
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Main Contractor to Subcontractor: Sign and start8 documents. Includes this document.