Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Main Contractor and Subcontractor

Site rules, attendances and contra-charge schedule

AED 59
Launch offerAED 29.50 on your first order, until 31 December.
Main ContractorSubcontractor
Clause
FIDIC Conditions of Subcontract 2011
Time limit
Set by the agreement
Format
Word, 6 pagesExcel, 7 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 3. Sign and startRoute: Both routes. Scope: Supply and install, Install only, Design, supply and install, Labour only

What this document does

  • What the main contractor provides free, what is charged and at what rate: power, water, cranage, scaffolding, waste removal.
  • Sent by the Main Contractor to the Subcontractor.
  • Written to FIDIC Conditions of Subcontract 2011.

What you get

Save with a pack

Main Contractor to Subcontractor: Sign and start8 documents. Includes this document.
AED 1,633AED 1,059Save AED 574

Also used between