Main Contractor and Subcontractor
AED 1,633AED 1,059Save AED 574
Subcontract agreement, design, supply and installation
AED 449
Launch offerAED 224.50 on your first order, until 31 December.
Main ContractorSubcontractor
Clause
FIDIC Conditions of Subcontract 2011
Time limit
Set by the agreement
Format
Word, 13 pagesEnglish and Arabic copy, 16 pages
Stage
Post-contract: 3. Sign and startRoute: Both routes. Scope: Design, supply and install
What this document does
- Specialist subcontract with design responsibility, shop drawing obligations, performance warranties and professional indemnity.
- Sent by the Main Contractor to the Subcontractor.
- Written to FIDIC Conditions of Subcontract 2011.
What you get
- Editable Word template
- An English copy, and a copy with English and Arabic side by side
- Schedules and appendices
- Clause-by-clause guide
- File: Word, 13 pages
- File: English and Arabic copy, 16 pages
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Main Contractor to Subcontractor: Sign and start8 documents. Includes this document.