Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Employer and Main Contractor

Tender query form

AED 39
Launch offerAED 19.50 on your first order, until 31 December.
Main ContractorEmployer
Clause
UAE practice
Time limit
Set by the agreement
Format
Word, 3 pagesLanguage: English, plus a full Arabic copy
Stage
Pre-contract: 1. TenderRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

What you get

Save with a pack

Main Contractor to Employer: Tender9 documents. Includes this document.
AED 811AED 529Save AED 282
Main contract tender and award process: Main Contractor steps6 documents. Includes this document.
AED 524AED 369Save AED 155

Free basic version or the full version

Free

Basic version

  • The English Word form, 3 pages
  • No payment and no sign-up
  • A line in the footer: Free basic version from builderdraft.com
Download free
Full version

AED 39

  • The same Word form, with no line in the footer
  • One-page guide on when and how to use it
  • Your logo and company details on every file
How to write it

How to write a tender query

A tender query asks the Employer to resolve a conflict, a gap or an error in the tender documents before you price. The instructions to tenderers set the last date for queries and the contact. The Employer answers every query to every tenderer without naming who asked, and issues any change to the documents as a numbered addendum.

What to include

  1. 1The tender name and number, your query number and the date
  2. 2The document, clause, drawing or bill item each query concerns
  3. 3The query itself, one per row, stating what conflicts or what is missing
  4. 4Your proposed reading, where it helps the answer
  5. 5Space for the answer, its date and any addendum it leads to
  6. 6A log of every query, answer and addendum, with any change to the tender deadline

When to use it

As soon as you find the point, and before the last date for queries in the instructions to tenderers, which is often 14 days before the tender deadline.

Read the full guideTender clarifications: queries, addenda and the best and final offer
Sample wording
TQ-007: Bill 3, item 3.15 measures 450 m of 300 mm diameter uPVC drainage pipe, but drawing D-102 shows 610 m of the same pipe. Please confirm which quantity to price. If the drawing governs, please correct the bill by addendum.

Common mistakes

  • Asking for pricing advice instead of pointing out a conflict or a gap
  • Relying on an answer given by phone, when only a written answer or an addendum counts
  • Missing the last date for queries, then pricing your own assumption as a qualification

Questions people ask

Will the other tenderers see my query?

They see the question and the answer, but not who asked. That way every tenderer prices on the same basis.

Is a query answer part of the contract?

Only if it is issued as an addendum or annexed to the Letter of Acceptance. A reply in the query log alone does not change the tender documents.

Where it sits in the processes

Main contract tender and award, step 5 of 14View all

Also used between