Main Contractor and Supplier
AED 256AED 169Save AED 87
Test certificates and certificate of origin checklist
AED 39
Launch offerAED 19.50 on your first order, until 31 December.
SupplierMain Contractor
Clause
UAE practice
Time limit
Set by the agreement
Format
Excel, 4 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Scope: Supply only, Supply and install, Design, supply and install
What this document does
- The certificates each delivery must carry, ticked off on receipt.
- Sent by the Supplier to the Main Contractor.
- Written to UAE practice.
What you get
- Checklist of attachments
- One-page guide on when and how to use it
- A full Arabic copy of every file, right to left
- File: Excel, 4 sheets
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Supplier to Main Contractor: Build and monitor4 documents. Includes this document.