Main Contractor and Subcontractor

Blockwork and plaster inspection checklist

SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 7.3
Time limit
Set by the agreement
Format
ExcelLanguage: English
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: Blockwork and plaster

What this document does

  • Setting out, bond, reinforcement, lintels, plaster thickness and tolerances.
  • Sent by the Subcontractor to the Main Contractor.
  • Written to FIDIC 1999 Red Book, Sub-Clause 7.3.
  • Written for: Blockwork and plaster.

What you get

Also used between