Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Main Contractor and Subcontractor

Blockwork and plaster inspection checklist

AED 39
Launch offerAED 19.50 on your first order, until 31 December.
SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 7.3
Time limit
Set by the agreement
Format
Excel, 3 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: Blockwork and plaster

What this document does

  • Setting out, bond, reinforcement, lintels, plaster thickness and tolerances.
  • Sent by the Subcontractor to the Main Contractor.
  • Written to FIDIC 1999 Red Book, Sub-Clause 7.3.
  • Written for: Blockwork and plaster.

What you get

Save with a pack

Subcontractor to Main Contractor: Build and monitor, Blockwork and plaster16 documents. Includes this document.
AED 1,116AED 729Save AED 387

Also used between