Ceiling and partition framing inspection checklist

SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 7.3
Time limit
Set by the agreement
Format
ExcelLanguage: English
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: Ceilings and partitions

What this document does

  • Framing, hangers, services above ceiling signed off before closing, and partition deflection heads.
  • Sent by the Subcontractor to the Main Contractor.
  • Written to FIDIC 1999 Red Book, Sub-Clause 7.3.
  • Written for: Ceilings and partitions.