Main Contractor and Subcontractor
AED 1,116AED 729Save AED 387
Ceiling and partition framing inspection checklist
AED 39
Launch offerAED 19.50 on your first order, until 31 December.
SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 7.3
Time limit
Set by the agreement
Format
Excel, 3 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: Ceilings and partitions
What this document does
- Framing, hangers, services above ceiling signed off before closing, and partition deflection heads.
- Sent by the Subcontractor to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 7.3.
- Written for: Ceilings and partitions.
What you get
- Fillable form
- Checklist of attachments
- A full Arabic copy of every file, right to left
- File: Excel, 3 sheets
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Subcontractor to Main Contractor: Build and monitor, Ceilings and partitions16 documents. Includes this document.