Client and Developer

Client change instruction

AED 59
Launch offerAED 29.50 on your first order, until 31 December.
ClientEmployer
Clause
Programme governance practice
Time limit
Set by the agreement
Format
Word, 3 pagesLanguage: English, plus a full Arabic copy
Stage
Pre-contract: 2. Design; Post-contract: 4. ConstructionRoute: Both routes

What this document does

  • The client instructs a change to the brief, budget or completion date, so the developer can carry it down into the consultant and contractor contracts.
  • Sent by the Client to the Employer.
  • Written to Programme governance practice.
  • Goes with: Programme change log and client change request

What you get

Save with a pack

Employer to Client: Design7 documents. Includes this document.
AED 603AED 389Save AED 214
How to write it

How to write a client change instruction

When a client wants something different from the approved brief, budget or completion date, it instructs its developer in writing. The instruction says what changes and why, whether to assess it first or proceed at once, and the cost limit. The developer then carries the change into the consultant and contractor contracts through their own change procedures.

What to include

  1. 1What changes, described clearly enough for a consultant to price it
  2. 2Why it is needed, and the brief, budget or date it changes
  3. 3Assess first, or proceed now because it is urgent
  4. 4The cost limit and the latest acceptable date
  5. 5The position now and after the change, side by side
  6. 6How the change will be carried into each contract
  7. 7The agreed effect on cost and time, signed once known

When to use it

As soon as the client decides it wants a change. The template sets short times for each step, such as 2 working days for the developer to acknowledge and 10 to assess, which you can adjust to your mandate.

Read the full guideVariations in construction: request, proposal and variation order
Sample wording
We instruct a change to the approved brief: add a 600 m² roof terrace restaurant to Building A. Please assess the effect on cost and time before any instruction goes to the consultant or the contractor. The cost limit for this change is AED 3,200,000, and the completion date must not move beyond 31 March 2028.

Common mistakes

  • Instructing the contractor directly instead of through the developer and the Engineer
  • Choosing proceed now for a change that could wait for an assessment
  • No cost limit, so the change grows without control

Questions people ask

Can the client instruct the main contractor directly?

No. Under a FIDIC main contract only the Engineer instructs Variations (Sub-Clause 13.1). The client instructs its developer, who has the change instructed through the contract.

Why assess first?

An assessment shows the real cost and time before anyone is committed. Changes made late in design or during construction cost more each month, so decide on the facts.