What this document does
- Pre-commissioning, commissioning and trial operation sequence with witness points and acceptance criteria.
- Sent by the Main Contractor to the Engineer.
- Written to FIDIC 1999 Yellow Book, Sub-Clause 9.1.
- For Design and Build projects only.