Concrete pour card and cube test register

SubcontractorMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 7.4
Time limit
Set by the agreement
Format
ExcelLanguage: English
Stage
Post-contract: 4. Build and monitorRoute: Both routes. Trade: Concrete structure, Precast

What this document does

  • Pre-pour checks, delivery dockets, slump and temperature, cube identification and 7 and 28 day results.
  • Sent by the Subcontractor to the Main Contractor.
  • Written to FIDIC 1999 Red Book, Sub-Clause 7.4.
  • Written for: Concrete structure, Precast.

What you get