Launch offer: 50% off your first order until 31 December. It comes off at checkout, no code needed.Launch offer: 50% off your first order

Engineer and Main Contractor

Contractor’s design programme

AED 79
Launch offerAED 39.50 on your first order, until 31 December.
Main ContractorEngineer
Clause
FIDIC 1999 Yellow BookSub-Clause 8.3
Time limit
Set by the agreement
Format
Excel, 4 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 3. Sign and startRoute: Design and Build

What this document does

  • Design packages, review periods, authority submissions and the link to procurement and construction dates.
  • Sent by the Main Contractor to the Engineer.
  • Written to FIDIC 1999 Yellow Book, Sub-Clause 8.3.
  • For Design and Build projects only.

What you get

Save with a pack

Main Contractor to Engineer: Sign and start6 documents. Includes this document.
AED 454AED 299Save AED 155