Engineer and Main Contractor
Contractor’s design programme
Main ContractorEngineer
Clause
FIDIC 1999 Yellow BookSub-Clause 8.3
Time limit
Set by the agreement
Format
ExcelLanguage: English
Stage
Post-contract: 3. Sign and startRoute: Design and Build
What this document does
- Design packages, review periods, authority submissions and the link to procurement and construction dates.
- Sent by the Main Contractor to the Engineer.
- Written to FIDIC 1999 Yellow Book, Sub-Clause 8.3.
- For Design and Build projects only.
What you get
- Excel schedules and summary sheet
- One-page guide on when and how to use it
- File: Excel
- Language: English
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project