Engineer and Main Contractor

Contractor’s design programme

Main ContractorEngineer
Clause
FIDIC 1999 Yellow BookSub-Clause 8.3
Time limit
Set by the agreement
Format
ExcelLanguage: English
Stage
Post-contract: 3. Sign and startRoute: Design and Build

What this document does

  • Design packages, review periods, authority submissions and the link to procurement and construction dates.
  • Sent by the Main Contractor to the Engineer.
  • Written to FIDIC 1999 Yellow Book, Sub-Clause 8.3.
  • For Design and Build projects only.