Engineer and Main Contractor
AED 454AED 299Save AED 155
Contractor’s design programme
AED 79
Launch offerAED 39.50 on your first order, until 31 December.
Main ContractorEngineer
Clause
FIDIC 1999 Yellow BookSub-Clause 8.3
Time limit
Set by the agreement
Format
Excel, 4 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 3. Sign and startRoute: Design and Build
What this document does
- Design packages, review periods, authority submissions and the link to procurement and construction dates.
- Sent by the Main Contractor to the Engineer.
- Written to FIDIC 1999 Yellow Book, Sub-Clause 8.3.
- For Design and Build projects only.
What you get
- Excel schedules and summary sheet
- One-page guide on when and how to use it
- A full Arabic copy of every file, right to left
- File: Excel, 4 sheets
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Main Contractor to Engineer: Sign and start6 documents. Includes this document.