Defect notification and log
AED 59
Launch offerAED 29.50 on your first order, until 31 December.
EngineerMain Contractor
Clause
FIDIC 1999 Red BookSub-Clause 11.1
Time limit
Before expiry of the defects notification period
Format
Word, 4 pagesExcel, 3 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 7. Handover and closeRoute: Both routes
What this document does
- Notifies each defect with location, date and response required, and logs it to close-out.
- Sent by the Engineer to the Main Contractor.
- Written to FIDIC 1999 Red Book, Sub-Clause 11.1.
- Time limit: Before expiry of the defects notification period.
- Step 11 of 14 in the Handover, defects and close-out process.
What you get
- Fillable form
- Log with status and ageing
- One-page guide on when and how to use it
- A full Arabic copy of every file, right to left
- File: Word, 4 pages
- File: Excel, 3 sheets
- Language: English, plus a full Arabic copy
- Brand-ready: your logo and company details go in when you download
- Pay once and use it on every project
Save with a pack
Engineer to Main Contractor: Handover and close6 documents. Includes this document.
Handover, defects and close-out process: Supervision Consultant steps5 documents. Includes this document.
Where it sits in the processes
Handover, defects and close-out, step 11 of 14View all
BeforeDefect report to the Employer during the defects period
This documentDefect notification and log
AfterRequest for performance certificate