Employer and Design Consultant

Design review comment sheet (A, B, C status)

AED 79
Launch offerAED 39.50 on your first order, until 31 December.
EmployerDesign Consultant
Clause
UAE practice
Time limit
Review period fixed in the agreement, commonly 14 to 21 days
Format
Excel, 4 sheetsLanguage: English, plus a full Arabic copy
Stage
Post-contract: 4. Concept design, 5. Schematic design, 6. Detailed design and approvals, 7. Tender packageRoute: Both routes
Procurement routeApplies to the Employer, consultants and Main Contractor

The Employer designs through its consultant, tenders complete drawings and bills, and the contractor builds. FIDIC 1999 Red Book.

What this document does

  • Numbered comments with the status code: approved, approved with comments, revise and resubmit.
  • Sent by the Employer to the Design Consultant.
  • Written to UAE practice.
  • Time limit: Review period fixed in the agreement, commonly 14 to 21 days.
  • Goes with: Design review response sheet
  • Step 7 of 15 in the Design appointment and design development process.

What you get

Save with a pack

Employer to Design Consultant: Concept design3 documents. Includes this document.
AED 118AED 79Save AED 39
Design appointment and design development process: Employer steps7 documents. Includes this document.
AED 1,003AED 699Save AED 304
How to write it

How to review a design submission

Every design submission, from concept to tender documents, should be reviewed the same way. Reviewers write numbered comments against each drawing or document and give each document a status code, and the consultant answers every comment. The sheet shows what is still open and whether the review went back on time.

What to include

  1. 1The submission, its reference and revision, the date received and the date due
  2. 2The list of documents reviewed, each with its status code
  3. 3Numbered comments, each against one document and one discipline
  4. 4The status codes: A approved, B approved with comments, C revise and resubmit
  5. 5The consultant’s response to each comment
  6. 6Whether each comment is open or closed, and who closed it

When to use it

Within the review period in the consultancy agreement, commonly 14 to 21 days from receipt. Send the sheet back with the overall status, then close each comment as the consultant’s next revision resolves it.

Sample wording
Comment 23, drawing A-301 Rev B, architecture: the corridor at gridline 7 is shown 1,100 mm wide; the brief requires 1,500 mm in the clinic wing. Please revise. Document status: C, revise and resubmit.

Common mistakes

  • Returning comments after the review period, which can delay the design and give the consultant a claim for time
  • Vague comments that cannot be acted on
  • Using comments to change the brief instead of a change request

Questions people ask

How is the overall status worked out?

One document coded C makes the whole submission C. With no C and at least one B, the submission is B. A submission is A only when every document is coded A.

Does approval make the client responsible for the design?

No. Reviewing and approving a design does not take over the consultant’s responsibility for it, which stays with the consultant under the agreement.

Where it sits in the processes

Design appointment and design development, step 7 of 15View all
BeforeConcept design report
This documentDesign review comment sheet (A, B, C status)
AfterSchematic design report